EDG 01A Supercharger Carrying-out, Repair 1 AU |
01. 2014 |
KEPCO KPS Co., Ltd |
Related to Satellite Terminal |
Bicycle Road (5~6 section) Repairing and Street Lights Replacement |
02. 2014 |
Uljin-gun Office |
Electrical Engineering |
Fixed Satellite Terminal |
12. 2013 |
KHNP |
Delivery of Counter-amphibious Obstacles and etc. |
Counter-amphibious Obstacles (Concertina, Barbed wire, Large iron pack) |
11. 2013 |
KHNP |
Delivery of Counter-amphibious Obstacles and etc. |
Project for Rocker Arm and Engine Poppet Valve |
10. 2013 |
KHNP |
Related to Rocker Arm |
Hanbit-1 Secondary Equipments Cooling Water Pump Sleeve Factory |
10. 2013 |
KHNP |
Related to Cooling Water Pump Sleeve |
Expansion of Feeding facility of Jukbyeon Elementary School and Other Mechanical Works |
07. 2013 |
KHNP |
Mechanical Works |
Vertical, Circulating, Electric Motor Pumps |
06. 2013 |
KHNP |
Related to Electric Motor |
Shop Repair of the Supercharger of EDG of Hanbit Unit 1 |
06. 2013 |
KHNP |
Exhaust Pipe Maintenance and etc. |
Shop Repair of the Supercharger of EDG of Uljin Unit 4 |
04. 2013 |
KHNP |
Maintenance of Exhaust Pipe |
Dismantling of the 2-stage Foam Barrier of Drainer in Uljin Headquarters |
04. 2013 |
KHNP |
Foam Barrier Removal and etc. |
Shop Repair of the Supercharger of EDG of Yeonggwang Unit 2 |
03. 2013 |
KHNP |
Maintenance of Exhaust Pipe |
Unit Price Contract for the Repair of Fuel Injection Device of 50-ton Class Main Engine |
02. 2013 |
Maintenance Depot of Marine Coast Guard |
Repair of Fuel Injection Device and Others |
Shop Repair of Generator Rotor Withdrawal Equipment |
02. 2013 |
KHNP |
Transport and Repair of Rotor |
Upper Footplate of Crane S-126 of Wolseong Unit 3 & 4 |
09. 2012 |
Wolseong Nuclear Power Plant |
Related to Crane |
Maintenance of Pump House Monorail of Wolseong Unit 3 & 4 |
09. 2012 |
Wolseong Nuclear Power Plant |
Maintenance of Monorail |
Regular Repair Work for Freezer of Uljin Headquarters Building |
07. 2012 |
Uljin Nuclear Power Plant |
Freezer OH |
Toilet Improvement Construction for Uljin Middle School |
06. 2012 |
Uljin Office of Education Support |
Toilets Remodeling |
Tank for Liquid (Ethanol Amine) |
06. 2012 |
Yeonggwang Nuclear Power Plant |
Manufacture of Chemical Tank |
Chamber, CCM Upper Cover, Diaphragm and Coolant Circulation |
06. 2012 |
Uljin Nuclear Power Plant |
Heat Exchanger |
The 8th Inspection of EDG of Yeonggwang Unit 5 |
05. 2012 |
Uljin Nuclear Power Plant |
Engine OH Work |
Geothermal Facility Construction for Office Building of Gori-1 Power Plant |
04. 2012 |
Gori Nuclear Power Plant |
Geothermal Facility Construction (Capacity: 253.1KW) |
Maintenance of EDG Engine of Uljin Unit 3 |
03. 2012 |
KEPCO KPS Uljin Office |
Engine OH Work |
Structures Construction for Suncheon Solar Power Plant |
03. 2012 |
Energy Natura Inc. |
Geothermal Facility Construction (Capacity: 253.1KW) |
Maintenance of EDG Engine of Uljin Unit 1 |
11. 2011 |
KEPCO KPS Uljin Office |
Engine OH Work |
Encrypting Equipment |
09. 2011 |
Uljin-gun Office |
Encryption of Software Devices |
Safety Net for Swimmers |
08. 2011 |
HAELYONG Inc. |
Safety Net for Swimmers going to Dokdo in Celebration of National Liberation Day |
ESCO Project to Recover Coolant Waste Heat of Combined #1 Block of Bundang |
07~12. 2011 |
SAMJIN Industrial & Steel Structure |
Waste Heat Recovery and Plumbing |
Renovation of Greenhouse and Shower Stall |
07. 2011 |
Gyeongbuk Northern Third Prison |
Convenient Facilities for Prisoners |
Chamber, Low-temperature Melting Furnace |
06. 2011 |
Uljin Nuclear Power Plant |
Heat Exchanger |
Remodeling of Medical Care Hospital of Uljin-gun Health center and County Hospital |
06. 2011 |
Uljin-gun Health center and County Hospital |
Remodeling |
ADR RF reader |
05. 2011 |
Uljin Nuclear Power Plant |
ADR Dispenser |
Repair of Coarse Screen of Onjeong Sewage Treatment Plant |
03. 2011 |
Uljin-gun Water and Wastewater Office |
Coarse Screen OH Work |
Disassembly, Inspection, and Repair of 50-ton MTU16V2000 |
05.2011 ~02. 2012 |
Marine Coast Guard Maintenance Depot |
Disassembly, Inspection, and Repair of Fuel Injection Devices (50 ton, 16 ea) |
Deodorizing Equipment for Food Recycling Facility |
09. 2010 |
Uljin-gun Office |
Deodorizing Equipment |
Production of CANDU-6 Mock (1 Set) |
08. 2010 |
KPS Gori Office |
Educational Materials |
Winding work for the Electric Motor of Drain Pump of Unit 1 |
05. 2010 |
Wolseong Nuclear Power Plant |
Motor Windings |
Impeller, Secondary Cooling Water Pump |
05. 2010 |
Yeonggwang Nuclear Power Plant |
Manufacture of Impeller of 935mm |
Repair of the Supercharger of EDG of Wolseong Unit 1 |
05.17.2010~06.25.2010 |
KHNP |
Turbo Charger Repairing |
Maintenance Support for EDG Exhaust Pipe of Yeonggwang Unit 6 |
02.24.2010~04.15.2010 |
KEPCO KPS |
Exhaust Pipe Maintenance |
Repair of Supercharger of EDG of Yeonggwang Unit 5 & 6 |
08.26.2009~09.12.2009 |
KEPCO KPS |
Turbo Charger Repairing |
Alternate AC Diesel Generator Project for New Wolseong Unit 1 & 2 |
07.22.1010~05.31.2011 |
DOOSAN ENGINE |
On-site Installation of Equipments and Technical Support for Commissioning |
EDG Project for New Wolseong Unit 1 & 2 |
10.01.2009~11.30.2011 |
DOOSAN ENGINE |
On-site Installation of Equipments and Technical Support for Commissioning |
Alternate AC Diesel Generator Project for Yeonggwang Unit 1 & 2 |
11.03.2009~05.31.2010 |
DOOSAN ENGINE |
Manufacture of Pipe and On-site Installation |
Alternate AC Diesel Generator Project for Uljin Unit 1 & 2 |
04.30.2009~05.31.2010 |
DOOSAN ENGINE |
On-site Installation of Equipments and Technical Support for Commissioning |
Emergency Diesel Generator Parts |
2004~2007 |
KHNP |
Supply of Parts of Emergency Diesel Generator including Supercharger |
Maintenance of the Dredger Engine of Namin Development (RUSTON 12RK270) |
10.20.2008~12.28.2009 |
Namin Development |
Total overhaul (Removing, Rearing, Mounting, Centering) Repair |
Total Overhaul and Repair of the Main Engine of Navy Boat (M-110) of the 2nd Fleet (PAXMAN VALENTA ENG) |
10.05.2008~02.28.2009 |
Navy Logistics Command Hyeopsin Crank |
Total overhaul (Removing, Rearing, Mounting, Centering) Repair |
Support for the Maintenance of EDG of Yeonggwang Unit 5 |
04.04.2008~04.28.2008 |
KEPCO KPS |
O/H Maintenance Support |
Repair of Supercharger of EDG of Yeonggwang Unit 3 & 4 |
12.17.2006~09.01.2007 |
KHNP |
Turbo Charger Repairing |
Repair of Supercharger of EDG of Uljin Unit 4 |
01.05.2005~01.28.2005 |
KHNP |
Turbo Charger Repairing |
Manufacture and Installation of Crane |
Occasional |
KHNP |
Intake / Reactor / Others |
Production of Distribution board and Switchgear |
Occasional |
KHNP |
Nuclear building, Company house |
Manufactured and Installation of Lagging |
Occasional |
KHNP |
Turbine / Reactor / Others |
Production of Steel Structures / Installation |
Occasional |
KHNP |
Nuclear Maintenance Facilities |
Pump / Valve / Maintenance and Repair |
Occasional |
KHNP |
Related to Nuclear Power |
Manufacture of Special Bolts |
Occasional |
KHNP |
Related to Nuclear Power |
Nuclear Equipment Test Facility |
Occasional |
KHNP |
Related to Nuclear Power |
Steam Generator Mockup |
Occasional |
KHNP |
Related to Nuclear Power |
Pipe Coating Work |
Occasional |
KHNP |
Related to Nuclear Power |
Nuclear Fuel Handling Tool |
Occasional |
KHNP |
Related to Nuclear Power |
Maintenance of turbine equipments |
Occasional |
KHNP |
Turbine Equipments |
Reactor Maintenance and etc. |
Occasional |
KHNP |
Reactor and Other facilities |